Neustadt tram
Source: http://www.bve-tram-neustadt.de.vu/ . Author: A. Lobach. Thanks ;-)
-
A fictional German tram network in the City of Neustadt.
-
3 lines are available.
-
The network is organised as follows:
Line 1 of the "Neustädter Verkehrsbetriebe"
-
This line runs from Neustadt main station to Waldbach
-
23 min are needed to cover 8,6 kilometres.
-
For the first 2,6km it runs the same route as the line 4.
Download
-
The Line 1 of the "Neustädter Verkehrsbetriebe" is available here for the route, here for the objets and here for the sounds.
Line 3/3E of the "Neustädter Verkehrsbetriebe"
-
This line runs from from Weinbergweg to Schönau station
-
28 min are needed to cover 8,8 kilometres.
-
The line 3E runs the short distance between Neustadt main station and the depot.
Download
-
The Line 3/3E of the "Neustädter Verkehrsbetriebe" is available here for the route 3, here for the route 3E, here for the objets and here for the sounds.
Line 4 of the "Neustädter Verkehrsbetriebe"
-
This line from Neustadt main station to Nordsiedlung.
-
20 min are needed to cover 6,8 kilometres.
-
For the first 2,6km this line runs the same route as the line .
Download
-
The Line 4 of the "Neustädter Verkehrsbetriebe" is available here for the route, here for the objets and here for the sounds.